CPS Infraestructuras Movilidad y Medio Ambiente S.L.

Valencia's Metro Mercat Station Infrastructure

Portfolio Detail

Regional Ministry for Infrastructure and Transport

img1
img1
img1
img1
img1
img1
img1
img1
img1
img1

Direction of the works of the construction project of the Infrastructure of Line 2 of the Metro of Valencia. Section Xàtiva-Line 4

SCOPE OF THE WORKS

The works include the infrastructure for Mercat station on line 2 of the MetroValencia network and a five-storey, 450 space underground car-park located beneath Ciudad de Brujas square.

The project has designed a space in the shape of a prism, with a total surface area of approximately 3.400 m² (110 *31 m.) and a depth of 30 m to the foundation slab that is the platform. The area is delimited by diaphragm walls reaching beyond the depth strictly necessary, thereby enclosing the projected bottom plug and ensuring that the excavation is made watertight against the infiltration of groundwater as the excavation deepens.

TASKS DEVELOPED
  • Study of the works contract documents
  • Review of the project
  • Works logbook
  • Check for changes in the specifications
  • Check building equipment
  • List the constructor workers and employees
  • Revision and approval of minutes
  • Unified awards for concepts in extra works
  • Environmental management supervision
  • Quality control at work

Call Action

Providing solutions and services in Civil Engineering since 1988.