Regional Ministry for Infrastructure and Transport - Spain
The objective of the project is the installation and commissioning of signals, interlocks, ATP/ATO and CTC systems on the lines 1, 3, 5 of Metro Valencia, and on-board equipment for these systems of all mobile material that will circulate through them. All these actions will contribute to provide the metro network of Valencia with a considerable increase in its capacity and, at the same time, contribute to the providing network with greater safety in circulation.
In cars and on track:
In Valencia Sud Centralised Traffic Control
In mobile equipment:
Providing solutions and services in Civil Engineering since 1988.