{"id":12910,"date":"2023-06-08T10:45:11","date_gmt":"2023-06-08T08:45:11","guid":{"rendered":"https:\/\/cps.es\/on-shore-power-supply-ops-systems-at-the-port-of-castellon\/"},"modified":"2023-06-08T10:45:58","modified_gmt":"2023-06-08T08:45:58","slug":"on-shore-power-supply-ops-systems-at-the-port-of-castellon","status":"publish","type":"post","link":"https:\/\/cps.es\/en\/on-shore-power-supply-ops-systems-at-the-port-of-castellon\/","title":{"rendered":"On-Shore Power Supply (OPS) Systems at the Port of Castell\u00f3n"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/cps.es\/wp-content\/uploads\/2023\/06\/web-port-castell.jpg\" alt=\"\" class=\"wp-image-12905\" width=\"512\" height=\"383\" srcset=\"https:\/\/cps.es\/wp-content\/uploads\/2023\/06\/web-port-castell.jpg 1024w, https:\/\/cps.es\/wp-content\/uploads\/2023\/06\/web-port-castell-300x225.jpg 300w, https:\/\/cps.es\/wp-content\/uploads\/2023\/06\/web-port-castell-768x576.jpg 768w, https:\/\/cps.es\/wp-content\/uploads\/2023\/06\/web-port-castell-650x488.jpg 650w\" sizes=\"(max-width: 512px) 100vw, 512px\" \/><figcaption class=\"wp-element-caption\">Port of Castell\u00f3<\/figcaption><\/figure>\n<\/div>\n<p>The  <strong>Port Authority of Castell\u00f3n<\/strong>  has awarded  <strong>CPS<\/strong>  technical assistance for the drafting of the technical-economic study and the basic construction project for the construction of a  <strong>substation<\/strong>  and the  <strong>implementation of &#8220;on-shore power supply&#8221; systems (OPS)<\/strong>  for the supply of electricity to ships docking at the Port of Castell\u00f3n with the objective of contributing to the  <strong>decarbonization  <\/strong>of the enclosure.<\/p>\n\n<p>Initially the project is focused on implementing the OPS systems in the Centenary dock, the development of this project will contemplate, through a technical economic study, the possibility of installing these systems throughout the port of Castell\u00f3n.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Port Authority of Castell\u00f3n has awarded CPS technical assistance for the drafting of the technical-economic study and the basic construction project [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":12906,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[94,186],"tags":[],"class_list":["post-12910","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-civil-en","category-facilities"],"_links":{"self":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts\/12910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/comments?post=12910"}],"version-history":[{"count":3,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts\/12910\/revisions"}],"predecessor-version":[{"id":12914,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts\/12910\/revisions\/12914"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/media\/12906"}],"wp:attachment":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/media?parent=12910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/categories?post=12910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/tags?post=12910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}