{"id":13013,"date":"2023-07-06T13:45:04","date_gmt":"2023-07-06T11:45:04","guid":{"rendered":"https:\/\/cps.es\/supervision-and-maintenance-of-traffic-control-equipment\/"},"modified":"2023-07-06T13:45:35","modified_gmt":"2023-07-06T11:45:35","slug":"supervision-and-maintenance-of-traffic-control-equipment","status":"publish","type":"post","link":"https:\/\/cps.es\/en\/supervision-and-maintenance-of-traffic-control-equipment\/","title":{"rendered":"Supervision and Maintenance of Traffic Control Equipment"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/cps.es\/wp-content\/uploads\/2023\/07\/edit_IMG_7368.jpg\" alt=\"\" class=\"wp-image-13009\" width=\"653\" height=\"337\" srcset=\"https:\/\/cps.es\/wp-content\/uploads\/2023\/07\/edit_IMG_7368.jpg 1000w, https:\/\/cps.es\/wp-content\/uploads\/2023\/07\/edit_IMG_7368-300x155.jpg 300w, https:\/\/cps.es\/wp-content\/uploads\/2023\/07\/edit_IMG_7368-768x396.jpg 768w, https:\/\/cps.es\/wp-content\/uploads\/2023\/07\/edit_IMG_7368-650x335.jpg 650w\" sizes=\"(max-width: 653px) 100vw, 653px\" \/><\/figure>\n<\/div>\n<p class=\"wp-block-paragraph\"><\/p>\n\n<p class=\"wp-block-paragraph\"><strong>CPS<\/strong>, in a joint venture, began work last June on the construction of the  <strong>supervision and maintenance of the traffic control equipment<\/strong>, as well as support for the  <strong>operation of the different traffic control and management systems in the Traffic Management Centers of Southwest, Southeast, Northwest-Cantabrian, North, Pyrenees-Ebro Valley, Center and Balearic Islands.<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">The objective is to ensure the correct operation of the management center&#8217;s equipment, advising the General Directorate of Traffic (DGT) and, on the other hand, the operation of traffic management systems through the implementation of protocols that optimize the center&#8217;s resources, preparation of technical documentation, etc.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CPS, in a joint venture, began work last June on the construction of the supervision and maintenance of the traffic control equipment, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":13010,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[104,99],"tags":[],"class_list":["post-13013","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-innovation","category-transportation"],"_links":{"self":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts\/13013","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/comments?post=13013"}],"version-history":[{"count":1,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts\/13013\/revisions"}],"predecessor-version":[{"id":13015,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts\/13013\/revisions\/13015"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/media\/13010"}],"wp:attachment":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/media?parent=13013"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/categories?post=13013"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/tags?post=13013"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}