{"id":8683,"date":"2019-03-20T06:01:00","date_gmt":"2019-03-20T06:01:00","guid":{"rendered":"https:\/\/cps.es\/cps-peru-begins-work-on-the-supervision-of-the-balance-of-the-work-for-the-improvement-of-the-cesar-vallejo-educational-infrastructure-in-uchiza-san-martin-region\/"},"modified":"2023-03-06T16:32:40","modified_gmt":"2023-03-06T16:32:40","slug":"cps-peru-begins-work-on-the-supervision-of-the-balance-of-the-work-for-the-improvement-of-the-cesar-vallejo-educational-infrastructure-in-uchiza-san-martin-region","status":"publish","type":"post","link":"https:\/\/cps.es\/en\/cps-peru-begins-work-on-the-supervision-of-the-balance-of-the-work-for-the-improvement-of-the-cesar-vallejo-educational-infrastructure-in-uchiza-san-martin-region\/","title":{"rendered":"CPS Peru begins work on the supervision of the balance of the work for the improvement of the C\u00e9sar Vallejo educational infrastructure in Uchiza, San Mart\u00edn Region."},"content":{"rendered":"\n<p>Last February, the Uchiza Supervisory Consortium, led by CPS Sucursal Per\u00fa, started the supervision of the work &#8220;Adaptation, Improvement and Replacement of the Educational Infrastructure of I.E.N\u00ba0425 C\u00e9sar Vallejo-Uchiza-Tocache-San Mart\u00edn&#8221;, promoted by the National Program of Educational Infrastructure-PRONIED- with an estimated duration of 390 days.<\/p>\n\n<p>The works will make it possible to adapt, improve and replace the existing infrastructure with an infrastructure adapted to educational use that will improve the quality of the school service in the city of Uchiza by means of an adequate design that ensures comfort, habitability and safety conditions and has a positive impact on student achievement and community welfare.<\/p>\n\n<p>The work will include the dismantling, demolition and correction of defects in existing structures and the construction of a new structure; the implementation of efficient electrical and sanitary installations, fire protection, as well as the necessary equipment to facilitate the uses and educational activities in the different types of environments foreseen.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last February, the Uchiza Supervisory Consortium, led by CPS Sucursal Per\u00fa, started the supervision of the work &#8220;Adaptation, Improvement and Replacement of [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":7547,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[106],"tags":[],"class_list":["post-8683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-infrastructure"],"_links":{"self":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts\/8683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/comments?post=8683"}],"version-history":[{"count":1,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts\/8683\/revisions"}],"predecessor-version":[{"id":8688,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/posts\/8683\/revisions\/8688"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/media\/7547"}],"wp:attachment":[{"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/media?parent=8683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/categories?post=8683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cps.es\/en\/wp-json\/wp\/v2\/tags?post=8683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}