{"id":8760,"date":"2019-12-20T09:33:00","date_gmt":"2019-12-20T09:33:00","guid":{"rendered":"https:\/\/cps.es\/attribution-du-marche-de-gestion-des-travaux-pour-lamelioration-des-installations-daccostage-du-quai-14-du-port-dalicante\/"},"modified":"2023-03-07T05:42:24","modified_gmt":"2023-03-07T05:42:24","slug":"attribution-du-marche-de-gestion-des-travaux-pour-lamelioration-des-installations-daccostage-du-quai-14-du-port-dalicante","status":"publish","type":"post","link":"https:\/\/cps.es\/fr\/attribution-du-marche-de-gestion-des-travaux-pour-lamelioration-des-installations-daccostage-du-quai-14-du-port-dalicante\/","title":{"rendered":"Attribution du march\u00e9 de gestion des travaux pour l&#8217;am\u00e9lioration des installations d&#8217;accostage du quai 14 du port d&#8217;Alicante."},"content":{"rendered":"\n<p>CPS, en association avec la soci\u00e9t\u00e9 INGEOMAR, a obtenu le contrat pour la gestion du chantier et la coordination de la sant\u00e9 et de la s\u00e9curit\u00e9 des travaux &#8220;Am\u00e9lioration des bornes et des d\u00e9fenses des installations d&#8217;accostage de la jet\u00e9e 14 du port d&#8217;Alicante&#8221; pour une p\u00e9riode de 6 mois.<\/p>\n\n<p>L&#8217;objectif des travaux est de permettre l&#8217;extension de l&#8217;utilisation commerciale des passagers le long de la jet\u00e9e 14 et de rendre le syst\u00e8me existant de d\u00e9fenses et de bollards compatible avec l&#8217;exploitation de la flotte de croisi\u00e8res pr\u00e9vue par l&#8217;autorit\u00e9 portuaire.<\/p>\n\n<p>Les travaux sont situ\u00e9s dans la partie sud-ouest du brise-lames ext\u00e9rieur, ou brise-lames de Levante, et couvrent une zone de 380 m de long et une largeur variant entre 6,8 m et 15 m mesur\u00e9e \u00e0 partir de la digue. Il comprend la d\u00e9molition de l&#8217;actuelle poutre en porte-\u00e0-faux et la construction d&#8217;une nouvelle sur pr\u00e9dalle, avec l&#8217;installation d&#8217;un syst\u00e8me de tirants ancr\u00e9s tous les 20 m, renouvelant le syst\u00e8me actuel de d\u00e9fenses et de bornes. Les travaux s&#8217;ach\u00e8vent par le dragage du front d&#8217;amarrage \u00e0 -8,85m dans la section 1 et -10,40m dans la section 2.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CPS, en association avec la soci\u00e9t\u00e9 INGEOMAR, a obtenu le contrat pour la gestion du chantier et la coordination de la sant\u00e9 [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":7576,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[95],"tags":[],"class_list":["post-8760","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cps-fr"],"_links":{"self":[{"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/posts\/8760","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/comments?post=8760"}],"version-history":[{"count":3,"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/posts\/8760\/revisions"}],"predecessor-version":[{"id":8803,"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/posts\/8760\/revisions\/8803"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/media\/7576"}],"wp:attachment":[{"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/media?parent=8760"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/categories?post=8760"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cps.es\/fr\/wp-json\/wp\/v2\/tags?post=8760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}