Energy Efficiency in Stations on the Xàtiva – Alcoi Line

Google Maps

CPS will carry out for ADIF the management of the works of the project of adaptation to BT regulations and energy efficiency of lighting in the stations of the Xàtiva – Alcoi line (64 kilometers). This project aims to modernize the railway infrastructure, both in terms of electrical safety and energy efficiency in the 11 stations of the line.

The project will include the updating of the protection boxes, the centralization of meters and the segregation of consumption in the low voltage switchboards. In addition, the electrical wiring will be replaced to comply with current regulations and the lighting in the stations will be improved by means of efficient technology, both indoors and outdoors, with the use of LED luminaires and adjustable lighting systems. Likewise, the grounding system will be adapted to ensure the safety and reliability of the electrical system.