Integral reform of the Faculty of Statistics at the Complutense University of Madrid.
CPS, in joint venture, within the framework agreement with the Complutense University of Madrid, carries out the integral reform of the Aulario […]
CPS participates in 2nd meeting of Mobility City project
Within the framework of the European Mobility Week, our colleague José Luis Faubel participated in the round table at the 2nd meeting […]
Remodeling and Construction of Links on the AP-7 – Girona Motorway
CPS will carry out for the Ministry of Transport, Mobility and Urban Agenda, the drafting of the projects of remodeling and construction […]
Feasibility Study for Reversible Lane
CPS will carry out for the Consejería de Fomento, Articulación del Territorio y Vivienda de la Junta de Andalucía , the technical […]
New Residence for the Elderly Dependents of Cullera
After completing the drafting of the construction project for the new Residence for the Elderly Dependents of Cullera, CPS has started the […]
New Centralized Traffic Control Center
CPS, in consortium, ends the Phase 1 of the preliminary design of the future building to be used as the new Centralized […]
Road Safety Audit in Mexico Pachuca – Tihuatlán, Mexico
CPS will carry out the Road Safety Audit of 235.9 kilometers of the Pachuca – Xicotepec and Xicotepec – Tihuatlán sections of […]
PROGRESS – REHABILITATION OF THE ZAPADORES POLICE COMPLEX
CPS continues with the supervision of the integral rehabilitation project of the Zapadores de Valencia police complex. In the initial phase, different […]
Supervision and Maintenance of Traffic Control Equipment
CPS, in a joint venture, began work last June on the construction of the supervision and maintenance of the traffic control equipment, […]
CPS incorporates P&L production unit
Aligned with the strategic objective of expanding its portfolio of services, CPS through its newly created subsidiary PYG Agua y Medio Ambiente […]
On-Shore Power Supply (OPS) Systems at the Port of Castellón
The Port Authority of Castellón has awarded CPS technical assistance for the drafting of the technical-economic study and the basic construction project […]