Work progress on the highway connecting to the Port of Oran
CPS continues to manage the construction works of the highway connecting the Port of Oran, Algeria. Being such an important work, we […]
Dredging of drainage channels in the Albufera de Valencia.
The City Council of Valencia has awarded CPS the management of the largest dredging project of the drainage channels of l’Albufera since […]
Permeabilization of the Cycle Path along the CV-30 highway.
CPS has developed the Construction Project for the Cycle Pedestrian Permeabilization of the CV-30 Highway, which proposes a new crossing point for […]
Pavement Repair by Cold Recycling on the N-232 Highway
During the last week of July 2022, as part of the activities of the Technical Assistance for the Control and Surveillance of […]
Duplication of the Valencia San Isidro-Buñol Line.
As part of the Suburban Railway Plan of the Valencian Community, CPS, in consortium, will prepare for Adif the “Functional Study for […]
Revitalization and Reopening of Urban Centralities in Metropolitan Lima
CPS in consortium, is carrying out for the Inter-American Development Bank and the Metropolitan Municipality of Lima, a project of “Revitalization and […]
Conditioning of the N-332 road in the Travesía de Xeraco, Valencia.
CPS carries out for the General Directorate of Roads of the Ministry of Transport, Mobility and Urban Agenda the drafting of the […]
Project design for direct connection between the V-30 and the A-3.
The General Directorate of Roads of the Ministry of Transport, Mobility and Urban Agenda has awarded CPS the drafting of the project […]