Access to Valencia airport. V-30 Highway
The purpose of the project is the definition and assessment of the works required for the duplication of the N-220 highway between the airport access junction and the junction with the V-30 highway, whose intermediate section consists of a cut-and-cover tunnel, the Manises junction and a new bridge over the Turia river.
Las tareas desarrolladas durante los trabajos son las siguientes
- Topographic Survey
- Evaluation of the Current State of the Road
- Geometric Road Design
- Traffic Study
- Soil and Pavement Study
- Structural Calculation
- Signaling and Road Safety
- Technical Specifications, Measurements, Unit Price Analysis, Budget and Execution Schedule
- Environmental Impact Study
- Interference Evaluation
El proyecto contempla las siguientes actuaciones:
- Remodeling and increasing the capacity of the airport link.
- The duplication of the N-220 in this section, which implies the remodeling of the Manises junction and the construction of a false tunnel with the design of all its facilities.
- The construction of a new viaduct over the Turia River and the enlargement of the existing viaduct to provide an additional lane.
- The remodeling of the V-30 junction, including collector roads for the connection with the Fuente del Jarro industrial park and a new circular branch that allows access to the N-220 for traffic circulating on the right-hand carriageway of the V-30.
- The construction of third lanes on the V-30, on the right bank between the N-220 junction and the E-15/ A-7 highway junction, and on both banks between the N-220 junction and the CV-371 road junction.
- The execution of a total of 25 structures.
Access to Valencia airport. V-30 Highway
Localización
Valencia, España
Cliente
Dirección General de Carreteras – Ministerio de Fomento
Fecha (inicio-fin)
Marzo 2009 – Enero 2016