CPS provided consulting services and technical assistance for the Bab Tarabulus project in Tripoli, Libya. The work consisted of the urbanization of the entire sector and the interior development of zones 2, 4 and 6.

Technical data:

Total constructed area: 900,000 m²

Zone 2:

  • Area: 380 m²
  • Subway parking: 076 m²
  • 7 Office buildings: 546 sq. m.

Zone 4:

  • Area: 660 m²
  • Subway parking: 174 m² (174 m²)
  • 7 Office buildings: 588 m²

Zone 6:

  • Area: 560 m² (560 sq.m.)
  • Parking area: 606 m²
  • 10 Office buildings: 46,450m² (46,450sq.m.)

Tasks performed:

  • Organization and Mobilization.
  • Quality procedures to be used by the contractor and consultant during the construction phase.
  • The Consultant’s Construction Management team will study and analyze both technically and economically the proposals submitted by the contractors and used to formalize their contract.
  • Organization of meetings with the contractor to agree on health and safety issues, site protection, visitors, line of communications, design logistics, temporary works, transportation of materials, office layout, quality control procedures, inspections and testing plan, etc.
  • Contractor’s Program and Planning.
  • Review of the Contractor’s detailed plan including mobilization of equipment, purchase of materials and delivery of drawings, arrangements with legal authorities to obtain their approval and provision of necessary services, Contractor’s general method statements as well as his staffing schedule and assignment of duties.
  • Quality and Health and Safety Plans.
  • Routine work during the construction period.
  • The consulting team must be fully familiar with the contract documents.
  • Review and comments on proposed drawings, material submittals, sampling method statements, inspection and test plans, checklists, etc.
  • Ensure that all relevant documents and drawings are approved prior to the commencement of any activity, as well as the inspection of models, materials and works in accordance with the inspection requests issued by the contractor.

Bab Tarabulus Zone 2, 4 and 6

Localización

Trípoli, Libia

Cliente

Libyan Investment and Development Holding Company (LIDCO)              

Fecha (inicio-fin)

Enero 2014 – Octubre 2016

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.